Here's my shooting protocol for the 0:28-0:31 sequence.
I'll post other "behind the scene" pics here this week.
Sunday, May 30, 2010
0:28 - 0:31 Sequence completed !
After hours of animation, wire removal, pictures cleaning (dust) and movie editing, the pan sequence (0:28 to 0:31) is completed.
Here it is.
I may change the framing a little, but it should remain the same. Not quite sure too, if i let the color correction like that.
I can count around 20 hours for the shooting and the post-production of these 3 seconds. I've learned a lot doing this sequence and i've improved my speed and confidence on almost every aspects of this art. If i had to do that scene again, i should do it in 12-15 hours. I'm very excited about doing the next scene.
Monday, May 17, 2010
Beginner's mistake
Failure here, big one ! A rock on the set blocked the character's rail support from his course at the end of the sequence. When i realized that, i though to myself that i didn't spent these last hours for nothing and have to "try" to let the rock slide a little bit, each frame til the rail could overpassed it. Total disaster.
I'm gonna scrap these 20 frames and restart at the 45th frame of that 70 frames sequence. 8 hours invested on the "shooting" of this sequence yet and lost almost 3 hours this week on it. I'll try to finish it this week but, maybe not tomorrow. Too pissed.
Subscribe to:
Posts (Atom)
